MES and PSG Application Summary and Contact Information

Purchaser Address and Contact:
End User Address and Contact:
Engineer Address and Contact:
If possible, please include phone, e-mail and full address.
Send Proposal to: Purchaser End User Engineer
Proposal Status: Budgetary Firm
Equipment Required at Site By: Quotation Due By:
PyroPure Technical Information: Refer to RFQ attached

Product Capacity Required
Pure Steam: at
WFI:
Configuration: Two Units One Unit Simultaneous Capacity One Unit Non-Simultaneous Capacity

Steam Supply
Pressure:

Feedwater Supply
Pressure: Temperature:
Pretreatment Method: (Example RO, DI, Softened)

Electrical Supply
115V/1PH 230V/3PH 460V/3PH Other 50 Hz 60Hz
Customer supplied UPS power to be utilized Mueller supplied UPS power required

Coolant Supply
Supply Pressure: Supply Temperature:
Return Pressure: Return Temperature:
Material: (Example: City Water, Propylene Glycol and %, Cooling Tower Water)

Physical Limitations
Installation Space L W H
Site Access L W H

Notes:
Prepared by: Date: